This detail shows a masonry expansion joint aligned with the window jamb. this is achieved by creating a soft joint at the end of the steel header angle; then bring the brick flush expansion joint with the brick back. blinking forms a 25 mm min. (50mm preferred) Vertical end dam where it ends at the head joint at the end of the lintel. the wall has a 50mm air gap for drainage; and the vents are spaced 600mm oc there is an air/moisture/vapor barrier on the cavity side of the cmu; and rigid insulation resides in the drain cavity.
-
Format
SKP
-
File size
284.26 KB
-