In this construction detail the entire implementation for a cpd is shown; built in a traditional way with 6h brick walls; plaster plaster and epoxy paint primer; It also shows the installation of a false floor with an optimum height of 50 cm. For a good air flow and cabling installation, be it network or power.
-
Format
DWG
-
File size
837.91 KB
-