Pretreatment (desander and grease trap); followed by primary treatment (four-chamber baffled tank); secondary treatment in horizontal flow subsurface wetlands and dehydration in drying beds. development of the entire system with construction details and specifications- autocad.
-
Format
DWG
-
File size
3.05 MB
-