Wastewater treatment plant for 360 inhabitants

Wastewater treatment plant for 360 inhabitants

Pretreatment (desander and grease trap); followed by primary treatment (four-chamber baffled tank); secondary treatment in horizontal flow subsurface wetlands and dehydration in drying beds. Technical drawings with dimensions and specifications.

  • Format DWG
  • File size 3.19 MB
share your appreciation