Spillway

Spillway

Conduit spillway; for chemususu dam is approximately 200 meters long, and the highest of the wall is 9 meters tappering up to 3 meters alo. The highest experience in the area is 4 Richter scale. the thickness of the slab base varies from 1,5 to 1 m, depending on the type of wall

  • Format DWG
  • File size 305.80 KB
share your appreciation