Medium voltage 22.9 kv – lurin 2018
Floor plan of the electrification project with a medium voltage utilization system; with medium voltage underground installations and bi-pole aerial substation.
- Format DWG
- File size 323.85 KB
Floor plan of the electrification project with a medium voltage utilization system; with medium voltage underground installations and bi-pole aerial substation.