Intake works for dams
Bridge intake work for a dam its long. It is 15 m long and is a standard project of the Secretary of Hydraulic Resources.
- Format DWG
- File size 2.63 MB
Bridge intake work for a dam its long. It is 15 m long and is a standard project of the Secretary of Hydraulic Resources.