Construction designed for the production of pigs; even weaned piglets; It has capacity for 32 pig bellies and a stallion; In addition to the administration area and warehouse; It also has a biodigester of 98m2 per year for the generation of biogas
-
Format
DWG
-
File size
2.97 MB
-