Business center building in Lima has 8 basements; 13 floors and a roof terrace; in all the mentioned areas they have sprinklers and class 2 fire-fighting cabinets; In addition, from the 2nd floor to the 13th floor, it has 2 evacuation stairs that reach the roof. the aci pumping equipment is a 129hp horizontal motorized pump; 500gpm; 235psi; 3000rpm; and the jokey is 12.5hp;5gpm; 170psi. the pumping equipment is located in basement 08; and the capacity of the aci cistern is 160m3
-
Format
DWG
-
File size
383.36 KB
-